Overview
3rd Engineer with DP3 exp. for MPSV, wage 4.696 USD
Please note that we require a 3rd Engineer with the following experience.
* Previously worked on board DP3 vessels
* Must speak GOOD English
* Joining on Saturday in Aberdeen 5th May
* Salary is USD 4696.00
Vessel Information
* Flag: Cyprus
* Gross tonnage: 4953 (since 01/03/2014)
* DWT: 4577
* Type of ship: Offshore Support Vessel (since 01/10/2013)
* Year of build: 2013
* Status: In Service/Commission (since 30/10/2013)
Design
DESIGN DPII MULTI-PURPOSE SUPPORT VESSEL (MPSV)
BUILT 2013, CONSTRUCTIONES NAVALES DEL NORTE
FLAG CYPRUS
Classification & General Information
* Classification: DNV + 1A1 SPS Clean (Design) COMF(V-3) DK(+) DYNPOS (AUTR) E0 HL(2.8) Ice (C) LFL2
* NAUT (OSV(A)) SF
* Operation: World Wide
* Endurance: 45 days plus
* Maximum Speed: Circa 15 knots
Dimensions
* Gross Tonnage: 4953
* Net Tonnage: 1486
* Deadweight: 3691.6 t
* Length Overall: 88.8 m
* Breadth Moulded: 19.0 m
* Depth to Main Deck: 8.0 m
* Draft: 6.6 m
* Freeboard max draft: 1.4 m
Deck Equipment
* Deck Load: 1560 t @ 10t/m2
* Deck Area Clear: 663 m2
* Clear Deck (41.2 m x 16.1 m)
* Main Crane — fully AHC Main line — 70 t AHC @ 16 m, 10 t @ 32 m — (with 2000 m wire)
* Whip line — 10 t @ 32 m (150 m wire)
* Provision Crane: 2 t @ 17 m
* Tugger Winch: 2 x 10 tons pull
* Capstan: 2 x 10 tons pull @ 25 m/min
* ROV Hangars (2) ROV Hangar Starboard Side — 5.6 m length, 8.9 m width, 10.9 m height
* ROV Hangar Port Side — 5.6 m length, 6.8 m width, 10.9 m height
Propulsion & Machinery
* Main Engines—Generators: 4 x Wartsila 9L20
* Main Propellers: 2 x Schottel SCD 2020 Azimuth @ 2,500 kW each
* Auxiliary Generators: 2 x Cummins 300 ekW each
* Emergency Generator: 1 x Cummins 150 ekW
* Bow Thrusters: 1 x Brunvoll Tunnel @ 1,200 kW
* 1 x Brunvoll Retractable Azimuth @ 850 kW
* Total Electrical Power: 4 x 1580 ekW
Accommodation
Total Accommodation: 71 persons
Client Facility: Project office, Offline room, ROV Control room, client office and conference room. Other Facilities: Messroom, recreation rooms (2), changing room, gym and sauna. Fully Air Conditioned. Incinerator Installed.
Communication
* Primary V-Sat—K-Band (adaptable to client requirements)
* Secondary IOP
* GMDSS As Per GMDSS A1, A2 and A3
Project Equipment
* Survey Suite — James Fisher Subsea
* Veripos Ultra, APEX and Standard DGPS Positioning c/w verify QC Software.
* EIVA Integrated Survey, Positioning, Acquisition and Processing.
* Interfaced to Vessel USBL, Heading and Attitude Sensors.
* Fibre optic Interfaces to ROV Sensors.
* Multi mode and single mode fibre optic connections throughout vessel.
* Purpose-built Online and Offline Survey Areas with dedicated offshore manager, project and client office.
* Distribution of Survey Displays to Key Desks including navigation display, recordable ROV and ships CCTV video and stills.
* Visualsoft DVR Systems. 4 channel DVR recording for each XLX ROV, with NAS and tape backup.
* ROV Suite — James Fisher Subsea
* Dual hangar based Triton XLX 150hp WROV systems, extensively outfitted and prepared for light intervention and high quality survey intensive operations.
Geographical Information
Date of record
Area where the ship was seen
Source
April 2018 West Europe MarineTraffic
March 2018 West Europe MarineTraffic
February 2018 West Europe MarineTraffic
January 2018 West Europe MarineTraffic
December 2017 Mediterranean Sea, West Europe MarineTraffic
November 2017 Mediterranean Sea, West Europe MarineTraffic
October 2017 Mediterranean Sea, South Asia, West Europe MarineTraffic
#J-18808-Ljbffr