Reactor Operator Trainee
The Opportunity
Exciting and rewarding opportunities have arisen at Sizewell B Power Station to join our highly skilled and motivated Operations Department at the heart of the station's safe, reliable generation. There are a number of vacancies to join the next Main Control Room Training Programme. Upon successful completion of the programme, you will be appointed as a Duly Authorised Person within a shift team, responsible for operating the reactor and all associated equipment.
About The Role
Reactor Operator Trainee
At Sizewell B, the Main Control Room teams play a fundamental role in providing a strong operational bias to the rest of the power station, identifying and escalating plant issues based on plant performance and developing standards to improve human performance, ensuring safe, reliable generation.
Pay, Benefits And Culture
The salary range for this role is between £45,641 and £81,263. The starting salary will likely be within £45,641 - £60,826, depending on experience, qualifications, and company parameters. We offer an attractive pension scheme, company benefits, and shift allowance where applicable. These are full-time, permanent positions based onsite at Sizewell B Power Station.
At EDF, we value diversity and strive for an inclusive environment. We are committed to equality, diversity, and inclusion, supporting social mobility, and being a disability confident employer.
What You’ll Be Doing
You will undergo a comprehensive training programme, including site familiarisation, off-site training, on-plant exposure, and simulator training. The programme lasts approximately 2 years, after which you will be qualified as a Reactor Operator, with opportunities for career progression within the Main Control Room. You will also be part of the Station Emergency Scheme, which involves rotational on-call duties with remuneration.
Who you are
* Have industrial and operational engineering experience
* Ability to think dynamically and handle multiple inputs
* Remain calm under operational pressures
* Hold a relevant HNC or degree
* Interested in working at a complex Nuclear Power Station
Please note: You must maintain physical fitness, pass a medical assessment, and obtain SC level vetting, which requires UK residency for at least 3 of the last 5 years.
Closing date for applications: 11th June 2025
Success is personal. It's your journey, powered by us. Join us and help Britain achieve Net Zero.
#J-18808-Ljbffr