Department: Design Reports to: Head of Design Job Overview responsible for coordinating, planning and overseeing the witnessing of commissioning; ensuring high technical standards are maintained throughout and evidenced with robust documentation and data Key responsibilities and duties Spot witnessing of earlier stages of commissioning and full attendance, and sign off, of Integrated System Testing activities. Attend Design coordination meetings through design stages Stage 3 & 4 to input on the commissioning ability of the design and to begin forming the commissioning approach. Own the commissioning process and the commissioning document approval process. Review of new or proposed customer contracts to assess any implications on commissioning of related facilities. Distribute commissioning plan, scripts, reports to company teams for review, comment or approval, collating feedback. Share the commissioning plan, scripts and reports with the client, leading commissioning presentations with support from suppliers. Collate design information ready for commissioning consultant / owners engineer design review. Propose design changes based on commissioning ability reviews and third party design reviews. Arrange Standard Operating Procedure SOP and Emergency Operating Procedure EOP workshops. Agree and plan the load bank and Power Quality Monitoring locations and specification. Define the scope of thermal imaging. Witness Level 1 Factory Type Testing of any new equipment Arrange and guide client witnessing of commissioning. With the support of the Technical Facilities and Client Teams ensure that any tests affecting other customers gain the required maintenance notifications. Witness of all Level 5 IST tests Agree the IST completion certificate with the commissioning consultant / owners engineer and major stake holders. Perform the first review of any final commissioning reports. Ensure the production of RCAs for any failed IST tests, reviewing and wider distribution of RCAs for sign off. Escalate any commissioning issues affecting handover dates or adversely affecting the resilience or availability of equipment at handover. Agree supplier's Q/A processes for commissioning. Review and agree electrical test plans with sub-contractors. Regular technical review of issues on the Issues Resolution Log Arrange and agree operations training plan. Arrange commissioning lessons learnt workshops after each IST. Performance review and general contract management of commissioning consultants / owners' engineers with support from Cost Consultants and Project Managers. Agree commissioning of any end user fit-out or customisation of electrical distribution completed after IST. Additional Requirements Ability to achieve security clearance (sponsored by company). Willingness to work across all company locations as role requires, with access to own transport