Contract Type
Fixed-term 15th June 2026 – 31st March 2028, possibility of extension.
Work Schedule
Mon – Fri.
Key Responsibilities
* Co‑ordination of LV/MV/HV operations
* Advise operationally on high voltage electrical installations to wind turbine generators, offshore substations, and both HV submarine and onshore cables
* Oversee all MV/HV/LV electrical operational activities to ensure safety, security, and integrity of the HV network
* Plan all switching activities on sites, both offshore and onshore
* Monitor and report in the SCADA system
* Manage and control a complete log of all activities on site, including all switching activities
* Control the safety documents for the Electrical Safety Rules on site
* Control and manage all HV and LV electrical operations on site
* Define safety procedures for electrical matters
* Oversee safe commissioning of grid connections, onshore substations, and associated MV/HV/LV plant and equipment
* Ensure adherence to Code Compliance in the relevant country
* Conduct QA on different ISO requirements in the project
* Review the high voltage scope of work
* Develop reference documentation and processes
* Apply and maintain knowledge and experience with country-specific standards
* Demonstrate knowledge of 50Hz and 60Hz standards for the electrical equipment
* Ensure compliance with and management of Electrical Safety Rules
* Coordinate with the Lead Commissioning Project Manager to ensure accurate updates are distributed to Project Management
* Coordinate MV/HV/LV commissioning activities throughout the project construction stages
* Manage and coordinate HV/MV/LV commissioning activities
* Liaise with National Grid and attend commissioning panel meetings
* Prepare and check high voltage switching schedules
* Check method statements for electrical matters
* Implement and provide training programs for relevant staff according to rules
* Provide technical and engineering advice to working parties for electrical matters
* Participate in safety coordination around electrical operations
* Manage outages and control the network
* Participate in On Calls and Out Calls regarding all activities on the electrical equipment on site
* Plan and take responsibility for outages on site, both offshore and onshore activities
* Support commissioning and start‑up activities for any components and systems
* Manage all electrical operations on site via the Control Log
* Control all high voltage switching activities both offshore and onshore
* Monitor and accept all LV switching activities on site
* Take charge of all switching programs
* Plan outages of the windfarm together with the Project Commissioning Team
* Provide safety from the systems and maintain a complete overview of all electrical operations on site
* Control resources and work activities
* Perform communication of complex technical and commercial issues
* Implement the Electrical Safety Rules on site, including the safe system of work
* Lead MV/HV switching and isolations
* Ensure consent of Electrical Safety Rules documents
Requirements
* Several years of operation and commissioning experience within high voltage electricity; offshore experience preferable
* Appropriate electrical qualification and background related to the authorization scope
* Minimum 3 years of working experience within onshore substation systems
#J-18808-Ljbffr