Job Title: Project Engineer
Contract length: 6 months
Reason for vacancy: Projects require resource
Essential skills:
Project details: Design and build of infrastructure projects - pumping stations and systems in the water industry.
Start date: As soon as possible
Pay: £440+
IR35: Inside
Essential skills:
- Strong technical knowledge and practical experience of managing design, installation, testing and commissioning of MEICA systems: pumps, valves, transformers, Ring Main Units, LV Switchgear, PLCs, MCCs, Remote Terminal Unit, instrumentation, control systems, systems integration (SCADA/Telemetry) etc
- Supervision of direct and subcontract delivered MEICA works
- Knowledge of NEC contracts
- Understanding of hydraulic systems.
- Liaison with DNOs
- Experience delivering projects for regulated water companies.
- Experience with HAZOP & ALM, FAT/SAT of the above, commissioning procedures of the above, inspection/test records, and documentation for project handover
- Experience in writing MEICA technical specification
-Experience in MEICA WIMES standards
- Procurement of equipment and subcontracts
- Experience in reviewing technical MEICA design drawings and specifications including Single Line Diagrams, MCC panel schematics, System/Network Architecture Drawings and Functional Design Specifications for SCADA and Telemetry