๐ง๏ธ ๐๐ผ๐ป๐๐ฟ๐ฎ๐ฐ๐ ๐๐น๐ผ๐ผ๐ฑ ๐ฅ๐ถ๐๐ธ ๐๐ป๐ด๐ถ๐ป๐ฒ๐ฒ๐ฟ
๐ ๐จ๐ (๐ฅ๐ฒ๐บ๐ผ๐๐ฒ / ๐๐๐ฏ๐ฟ๐ถ๐ฑ ๐ผ๐ฝ๐๐ถ๐ผ๐ป๐)
๐ฐ ยฃ40โยฃ50 per hour (Outside IR35 โ DOE)
๐
6โ12 months contract (likely extension)
The Opportunity
Weโre working with a well-established engineering consultancy looking to bring in a Contract Flood Risk Engineer to support a growing pipeline of residential and commercial development projects.
This is a handsโon technical role, ideal for someone who can produce high-quality reports and manage drainage strategy work with minimal supervision.
The Role
Youโll be responsible for delivering Flood Risk Assessments and drainage strategies to support planning applications across a range of schemes.
Key Responsibilities
* Preparation of Flood Risk Assessments (FRA)
* Production of Drainage Strategies for planning submissions
* Design and integration of SuDS solutions
* Surface water management and discharge calculations
Liaison with
* Local Authorities
* Lead Local Flood Authorities (LLFAs)
* Environment Agency
* Supporting planning applications and responding to technical queries
* Software: InfoDrainage / MicroDrainage
* Causeway Flow (desirable)
* AutoCAD / Civil 3D (beneficial)
Requirements
* Strong experience delivering FRA & drainage strategy reports
* Good understanding of UK planning and flood risk policy
* Experience working on residential / commercial developments
* Ability to work independently and manage your own workload
* UK project experience essential
Why This Role?
* Outside IR35 flexibility
* Fully remote / hybrid working
* Strong pipeline of secured work
* Immediate start available
* Opportunity to work on a variety of development schemes
๐ฉ If youโre a Flood Risk Engineer available for contract work, get in touch to discuss further.
#J-18808-Ljbffr