Essential Role Requirements: · Minimum of 2 years’ experience · Assist in the construction and dismantling of formwork for concrete structures · Measure, cut, and assemble formwork materials such as wood, metal, and plastic · Must be able to do Tamp Finish, float finish, brush Finish, Trowel finish, Power float finish and able to make good of concrete · Ability to read and interpret drawings, and specifications accurately and implement on site · Proactive and able to manage time effectively · Able to work independently and as part of a team Desirable: · 5 Years experience General Expectations: · Reliable & punctual · Able to work well with other trades and operatives on site and support the programme delivery on time · Right to work in the UK