Jobs
My ads
My job alerts
Sign in
Find a job Career Tips Companies
Find

Senior estimator

Swindon
Permanent
Solution Recruitment
Estimator
Posted: 12 June
Offer description

My client, a Tier 1, Main Contractor require a permanent Senior Estimator with a strong Civil Infrastructure background to based from their Swindon OR London office.

Purpose of the Role

Preparation of detailed and accurate pricing for tenders and Supporting Clients with pricing support for Early contractor involvement projects.

Role Accountabilities

1. Ensure company governance procedures are followed at all times
2. Work in coordination with the Bid Manager to ensure competitive pricing.
3. Agree methodologies and outputs for key activities with Planner and, where appropriate the Bid Manager and Design Manager.
4. Provide advice to Bid Manager/ Design manager on most competitive design options.
5. Price alternative design solutions
6. Produce competitive price using methodologies and outputs etc. to suit conditions/ situations relevant to the scheme.
7. Advise Bid Manager on sufficiency of Client bill of quantity/ activity schedule and arrange for full quantity take off or checking as required.
8. Preparing the price estimate for tenders or budget pricing comprising the following aspects:

Labour including the following aspects:

9. Develop local rates/ build up rates for self-delivered items
10. Ensure Working Rule Agreement (and any other specific requirements such as London Living Wage) included in labour rates
11. Prepare scheme specific labour rate calculation where required.

Plant including the following aspects:

12. Develop local rates/ build up rates for self-delivered items
13. Liaise with Planner to reconcile plant resource levels

Materials including the following aspects:

14. Comparison sheet for materials considering unit rate (conversation factors), wastage, waiting times and part loads etc.
15. Liaise with procurement to determine appropriate selection of suppliers to send enquiries to.

Subcontract packages including the following aspects:

16. Liaise with procurement & bid team to determine appropriate selection of subcontractors to send enquiries to.
17. Liaise with procurement to determine the sufficiency and compliance of subcontractor quotations
18. Preparation of comparison sheet for subcontractors detailing additions/ deletions from quoted rates
19. Liaise with procurement and bid manager and agree on the selection of the subcontractor to be used in the estimate.
20. Liaise with procurement to determine the sufficiency and compliance of supplier quotations
21. Liaise with procurement and agree on the selection of supplier quotations to be used in the estimate.

Temporary works

22. Liaise with Planner/ Technical Services and Temporary Works Coordinator to agree extent and nature of temporary works
23. Agree costs of temporary works with temporary works coordinator.

Staff

24. Agree staffing levels and produce staff programme with Bid Manager and Operations lead.
25. Use currently weekly staff rates to price staff
26. Agree staff patterns and overtime rates with Operations lead for out of normal hours working – note these need to comply with Working time directive/ NR fatigue guidance etc.
27. Preliminaries
28. Liaise with Planner to determine overall duration of preliminaries
29. Coordinate and liaise with Bid Manager to ensure all aspects of Clients requirements included as necessary (CCS/ CEEQUAL etc).

Risk

30. Input with Bid Manager and tender risk manager into tender risk/ opportunity register

Final settlement and submission

31. Produce top –sheet tender summary in current format and associated back up sheets
32. Present pricing build up at pre-settlement and settlement meetings
33. Prepare adjustments sheet in coordination with Bid Manager to reflect settlement adjustments
34. Prepare final pricing documentation for inclusion with tender submission – where possible ensuring pricing maintains a positive cash flow throughout the project.
35. Coordinate with Bid Manager for the production of the Form of tender/ Contract Data Part 2 as required.
36. Liaise with Bid Manager and address any post tender clarifications/amendments issued by the Client.

Handover (for successful bids)

37. Prepare handover pricing document for issue to Project Manager and Commercial Manager
38. Attend Handover meeting with Bid Manager

Review (for unsuccessful bids)

39. Coordinate with Bid Manager to review feedback on tender price (where provided) for future tenders

Apply
Create E-mail Alert
Job alert activated
Saved
Save
Similar job
Estimator
Swindon
Permanent
Morson Talent
Estimator
Similar job
Senior estimator
Swindon
Permanent
Hays Construction And Property
Estimator
Similar job
Estimator (electrical)
Cirencester
Permanent
MCG Construction
Estimator
See more jobs
Similar jobs
Construction jobs in Swindon
jobs Swindon
jobs Wiltshire
jobs England
Home > Jobs > Construction jobs > Estimator jobs > Estimator jobs in Swindon > SENIOR ESTIMATOR

About Jobijoba

  • Career Advice
  • Company Reviews

Search for jobs

  • Jobs by Job Title
  • Jobs by Industry
  • Jobs by Company
  • Jobs by Location
  • Jobs by Keywords

Contact / Partnership

  • Contact
  • Publish your job offers on Jobijoba

Legal notice - Terms of Service - Privacy Policy - Manage my cookies - Accessibility: Not compliant

© 2025 Jobijoba - All Rights Reserved

Apply
Create E-mail Alert
Job alert activated
Saved
Save