Job Description
Are you ready to be part of a groundbreaking infrastructure project that will shape the future of energy in the UK?
Eastern Green Link 2 (EGL2) is a transformative 5-year initiative delivering a 525kV, 2GW high-voltage direct current (HVDC) subsea transmission cable connecting Peterhead, Scotland to Drax, England. This will be the longest HVDC cable in the xsngvjr UK and the largest single transmission pro
Are you the right candidate for this opportunity Make sure to read the full description below.
Please click on the apply button to read the full job description