Requirement for 2 Industrial Electricians for2 days starting on 24/03/2026, must have experience working on Water treatment / Sewage Treatment sites or in a similar industrial environment. Will be required to be able to follow drawings and install industrial water treatment equipment. Will be required to wire up power supply to plc for 2 x Pumps. Site hours are 7:30am for induction until 4:30pm.
Will require ECS Gold Card and Full orange PPE as well as own basic tooling. Can be paid CIS through payroll company.
Travel time and accommodation can be discussed if required.
Requirements:
* ECS Gold Card.
* Full Orange PPE .
* Own basic tooling.
* Industrial Experience.
About UKSE Group:
From Healthcare to utilities, UKSE Group provide leading services worldwide. UKSE Group is a specialist provider of:- Contract Engineering Services- Site Teams & Construction Operations- Engineering Projects & Maintenance Services - Healthcare ProfessionalsUKSE work within the following sectors:- Healthcare- Hospitality- Utilities- Power & Energy- Commercial Facilities- Specialist Construction UKSE Group is structured to carry out long / fixed term contracts, short term contracts / reactive call out, plus planned complete turnkey project management and maintenance services on a 24/7 basis.