Role: Programme Scheduler
Position: Contract
Location: Leiston (3 days on-site)
Days on Site: 3
Duration: Approx until 31st Dec 2026
Pay: DOE, up to 690£PAYE/ 945£ UMBRELLA
Sizewell C is designing and intends to construct, commission, operate and decommission two UK EPR reactors on the SZC Site, located at Sizewell, on the east coast of the County of Suffolk. It will be within the civil parish of Leiston cum Sizewell.
The SZC Project will be the most advanced nuclear generation asset in development in the UK with 3.2 GW of power capacity, providing 60 years of electricity generation and 7% of the UK's current electricity demand, and directly supporting up to 70,000 jobs. SZC will be delivered as a regulated utility, with a robust RAB model and a comprehensive Government Support Package to provide protection against low-probability high impact risks. The project will be based on the HPC nuclear power station, replicating the UK EPR design that is being built at HPC, and will use the majority of the same supply chain resulting in a significant reduction in construction risk.
Function & Position Overview
SZC Project Controls will serve as a centre of excellence, managing and strategically using delivery performance management information. Our team will enable successful delivery of SZC Proj...