Costain have won extensive work across the water sector this year to support the AMP 8 investment cycle. We have been appointed by United Utilities as one of 7 partners to the Enterprise, delivering £5.5bn of projects in the Asset Management Period 8 (AMP8) between 2025 – 2030, and AMP 9 (2030 – 2035).Our scope is to provide project management, design, construction and commissioning services on design and build schemes throughout the North West and Cumbria region covered by United Utilities. Projects vary in value, covering both infrastructure and non-infrastructure assets on water and wastewater sites with wider Enterprise partners.
Reporting to the Principal Design Manager you will be responsible for the design delivery of water projects on the United Utilities (UU) AMP8 Framework. Adopting a hybrid working model you will split your time between the Costain Manchester office, UU Warrington offices, design partner offices, UU sites and home as required.
You will have experience working within the water sector, in either Mechanical, Electrical ICA or Civils disciplines in maintenance, design, or capital delivery roles. You should be a motivated team player, with the ability to work collaboratively with multiple teams to deliver production thinking carbon efficient design solutions.
You should also demonstrate a thorough understanding of design delivery, design procurement, design management, design control, quality assurance, BIM to ISO 19650 and have a working knowledge of the NEC4 suite of contracts.
#J-18808-Ljbffr