1x Gold card electrician required Must have 2391 and tester £300 for the shift Tescos Bradford Road, Melksham, SN12 8LQ Start: 4pm - finish once the woek is completed Scope of Works • Isolate the power to the SCO corals in scope • Disconnect all Category 6 data network ports and 13A power sockets currently feeding the terminals • Pull back the existing cabling and safely coil • Remove all faceplates/sockets and backboxes and safely store them • Wait whilst NCR engineers remove the legacy SCO terminals and re-install the new terminals in place • Re-route the previously pulled back cabling into the new SCO terminals • Reinstate the previously removed backboxes • Re-terminate the previously removed Category 6 modules/faceplates and 13A sockets • Reinstate power and test the re-terminated sockets