The Construction Manager is responsible for the safe, compliant, and commercially effective delivery of high‑voltage substation construction packages within a National Grid transmission or distribution framework. Operating as the principal point of accountability on site, this role bridges the client interface, design teams, and self‑delivery/subcontract workforce to drive projects from mobilisation through to energisation and handover.
This role typically leads packages valued between £5m and £50m+ across new‑build, refurbishment, and operational (live) substation environments at voltages up to and including 400kV.
Key responsibilities
* Take full accountability for the safe delivery of all construction activities on site, ensuring compliance with CDM 2015, National Grid safety rules, and the principal contractor's SHEQ management system
* Lead and co‑coordinate multi‑discipline site teams covering civil, electrical, M&E, and commissioning workstreams across the full project lifecycle – from enabling works through to energisation
* Develop, maintain, and drive the construction programme using Primavera P6 or MS Project; own the look‑ahead schedule and chair weekly progress meetings with the client representative
* Own the commercial position on site – manage subcontractor performance, authorize timesheets and applications, identify and notify Early Warning events under NEC4 contract, and support the QS in compiling compensation event submissions
* Manage the site‑level risk register; chair RAMS and method statement reviews; enforce permit‑to‑work and National Grid safety documentation (BESC, SR163, competency authorisations)
* Serve as the primary interface with the National Grid Authorising Manager and client delivery team on all day‑to‑day technical and programme matters
* Oversee quality assurance on all permanent works; review ITPs, manage NCR close‑out, and sign off inspection records against project specification and National Grid technical standards
* Manage plant, material, and labour resource planning including forecasting and procurement support for long‑lead items
* Produce weekly construction reports, progress photographs, KPI dashboards, and monthly board‑level updates in line with the programme's reporting cadence
* Mentor and line‑manage site supervisors, site engineers, and graduate staff embedded within the construction team
* Lead site handover, commissioning coordination, and as‑built record compilation through to practical completion and National Grid acceptance
Requirements
* Minimum 7 years' construction delivery experience, with at least 4 years managing HV/EHV substation projects (132kV, 275kV, or 400kV)
* Proven track record as Construction Manager or Package Manager on a National Grid transmission or NGED distribution framework
* Demonstrable experience managing civil, electrical, and M&E subcontractors concurrently on live operational sites
* Strong working knowledge of NEC3 / NEC4 target cost and lump‑sum contract mechanisms including change control, early warnings, and compensation events
* Hands‑on CDM Principal Contractor experience with full SHEQ accountability
* Proficiency in Primavera P6 or MS Project for programme management and look‑ahead planning
Desirable experience
* Experience on HVDC converter or ASTI programme delivery (Eastern Green Link, Viking, LionLink or similar)
* Previous exposure to SF6‑free GIS switchgear installation and commissioning
* Background in both substation EPC (turnkey) and civils‑only package delivery
* Experience managing outage windows and access agreements on energised transmission infrastructure
* Working knowledge of National Grid's Primavera‑based programme governance and reporting requirements
#J-18808-Ljbffr